Composting Toilet
This project is part of the Upstate house located in the Binnewater Lakes Region. It is conceived with the purpose of allowing the owners to use their land as a camping spot while the main house is completed. The bathroom is built using materials recovered from an almost 100-year-old cottage and fallen trees found on the lot.
Location
Hurley, NY
Project Type
Infrastructure
Year
In progress
Model
Exploded 3D Diagram
Plan
Dry composting toilet
Upcycled wood lumber
Materials
Side Elevation